Please use this identifier to cite or link to this item: https://hdl.handle.net/10316.2/33357
DC FieldValueLanguage
dc.contributor.authorWang, Bo
dc.contributor.authorXiaohua, Xia
dc.date.accessioned2014-09-09T09:45:06Z
dc.date.accessioned2020-09-10T09:00:32Z-
dc.date.available2014-09-09T09:45:06Z
dc.date.available2020-09-10T09:00:32Z-
dc.date.issued2014-
dc.identifier.isbn978-972-8954-42-0 (PDF)
dc.identifier.urihttps://hdl.handle.net/10316.2/33357-
dc.description.abstractExisting studies paid most attentions to the strategic planning of building retrofitting project. During the actual operation, the overall energy performance of the retrofitting project deteriorates over time owing to the usage and failures of the retrofitted facilities. For the sustainability of energy efficiency, the maintenance plan optimization for the retrofitted facilities must be considered, which suggests the possibility to sustain the building energy efficiency during operating. However, the overall energy performance reveals strong time dynamics subject to the failures and maintenance actions, which make the maintenance plan optimization a complicated problem. This paper characterizes the dynamics of the totality of the retrofitted facilities by the multi-state system models governed by a discrete-time Markov process. The impacts of both preventive and corrective maintenance actions on the over energy efficiency of the plant are then quantified by the present model. The optimization problem is thus casted into a stochastic optimal control problem which aims at maximizing the long-term energy efficiency and financial payback. An MPC based approach is employed to solve the present control problem. Finally, a case study is conducted to demonstrate the effectiveness of the present approach.eng
dc.language.isoeng-
dc.publisherImprensa da Universidade de Coimbrapor
dc.publisherFaculdade de Ciências e Tecnologia da Universidade de Coimbra, Departamento de Engenharia Mecânicapor
dc.relation.ispartofColecao:http://hdl.handle.net/10316.2/33309por
dc.rightsopen access-
dc.subjectBuilding retrofittingeng
dc.subjectFacilities maintenance policyeng
dc.subjectEnergy efficiencyeng
dc.subjectMulti-state systemeng
dc.subjectControl systemeng
dc.titleA control system approach to optimal maintenance planning for building retrofitting projectpor
dc.typebookPartpor
uc.publication.firstPage65-
uc.publication.lastPage71-
uc.publication.locationCoimbrapor
dc.identifier.doi10.14195/978-972-8954-42-0_10-
uc.publication.digCollectionPBpor
uc.publication.orderno10-
uc.publication.areaCiências da Engenharia e Tecnologiaspor
uc.publication.bookTitleProceedings of Maintenance Performance Measurement and Management (MPMM) Conference 2014-
uc.publication.manifesthttps://dl.uc.pt/json/iiif/10316.2/33357/212135/manifest?manifest=/json/iiif/10316.2/33357/212135/manifest-
uc.publication.thumbnailhttps://dl.uc.pt/retrieve/11181506-
uc.publication.parentItemId53866-
uc.itemId70462-
item.fulltextWith Fulltext-
item.grantfulltextopen-
Appears in Collections:Proceedings of Maintenance Performance Measurement and Management (MPMM) Conference 2014
Files in This Item:
File Description SizeFormat 
mpmm_artigo10.pdf2.42 MBAdobe PDFThumbnail
  
See online
Show simple item record

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.